Presentation of the Best Practice
Target challenge
- Difficult access to water
- Vulnerability to climate Change
- Reclacitrance to use treated NCW
- Other (Please specify below)
- Flash-flood hazard and infrastructure/property damage from unmanaged runoff events; seasonal and chronic water scarcity affecting domestic supply, livestock watering, and rain-fed agriculture; progressive depletion and localised salinisation of shallow co
Area Typology
- Urban area
- Rural area
- Agricultural area
- Other (Please specify below)
- Rural, dryland, semi-arid coastal wadi catchments with dispersed Bedouin settlements; the peri-urban fringe of Marsa Matruh city; pastoral rangeland; rain-fed agricultural terraces on wadi floors and lower slopes.
Main beneficiaries
- Local Population
- Other (Please specify below)
- Rural Bedouin households across Matrouh Governorate relying on rain-fed agriculture, livestock, and shallow wells for domestic supply; the wider governorate population (538,546 according to the January 2023 CAPMAS census) is the indirect beneficiary group
Funding
- EU funding
- National funding
Used technologies / tools
- Soil infiltration
- Sustainable Drainage Systems
- Sedimentation
- Filtration
- ERT: Electrical Resistivity Tomography ;
- Time-Domain Electromagnetic (TEM) /DEM;
- TDIP;
- HEC-HMS;
- RES2DINV;
- IX1D;
- ArcGIS;
- QGIS
Implementation site
NCW type
- Rainwater (RW)
- Other
NCW USE
- Garden Irrigation
- Field irrigation
- Ground Water Recharge
- Other (Please specify below)
Self-Assessment
TRL : Technology Levels
Obstacles to implementation
- Lack of an adequate regulatory framework
- Lack of public acceptance of water reuse
- High cost of technological solutions
- Other (Please specify below)
- Subsurface heterogeneity of the alluvial and fractured-carbonate wadi fill, which is difficult to characterise from surface geomorphology alone and historically required either expensive borehole programmes or accepting higher siting uncertainty; limited
Obstacles to funding
How your Best Practice is economically feasible ?
Financial continuity for this practice rests mainly on its integration within larger, externally financed rural development programmes rather than on cost recovery from water users. The original SDCMR infrastructure (from 1994) was capitalised through Government of Egypt and World Bank IDA co-financing of the broader SDCMR establishment programme; more recent expansion and rehabilitation is supported through the IFAD-PRIDE loan and grant (2019–ongoing). Harvested water is provided to communities without direct user charges, so the practice does not generate revenue to offset its own operating costs; its sustainability therefore depends on continued public and donor investment rather than on a self-financing tariff model.Result of this assessment
Enviromental impact
SDGs
Energy consumption comment
Validation/upscaling
Potentiel of exploitation/outscaling
Lessons learnt
Recommandations
Highlighted KPI
Technical indicators
Economical indicators
Without consideration of the depreciation period
Social impact of the BP
Jobs created comment: NA